VW Poznań Antoninek

Project Description:

Acting on behalf of Volkswagen Poznań, EMEP conducts installation works on the expansion of the VW factory in Poznań. The scope of work includes low voltage installation with lighting in the H5A Welding Hall and H44 Logistics Hall. In addition, in the Logistics Hall EMEP will perform a package of mechanical installations with automation including heating, ventilation, water, sewage and hydrant installations. In addition to the above work, EMEP will expand medium-voltage switchgear and install new transformer stations with active filters in both newly built halls. The works will last until the end of March 2019.