Assuta Medical Center | Ramat HaChayal

Israel

New hospital building
  • Location: Ramat HaChayal, Tel Aviv
  • Client: Assuta
  • Period: 2009 - 2006
  • Budget: NIS 49 million
  • Area:
    25,000m2
  • Description:

    Air conditioning and ventilation systems along with patient rooms, operating rooms, laboratories, public spaces, and parking. The 16 operating rooms included design, supply, and installation of all electrical and HVAC systems, as well as the accompanying electromechanical systems: illumination booms, medical gases, sanitation and ventilation systems, and bed head units. Also were responsible for electrical, communication and control systems, CCTV, HMI for operating rooms, ICUs, laboratories, MRI, catheterization rooms, dialysis rooms, and hospitalization wards. Comprehensive maintenance of all electromechanical systems, electricity, plumbing, inspection preparation as well as medical and pharmacological accreditation processes. 

Project in cooperation with: