A number of major projects at Terminal 1, 3 and 4 of Ben Gurion Airport.
  • Client: Israel Airports Authority
  • Area:
    330,000 square meters
  • Description:

    Power station design. Construction and installation of 161 kW substation and medium voltage substations including 30 transformers. Installation of track-lighting in aircraft transportation routes and aircraft parking lights. All terminal electrical systems | Installation and maintenance of sprinkler systems at terminals 1-4 |Unique fire extinguishing systems in the Ashdod Bonded warehouse for agricultural produce, that includes a floating system over ammonia tanks, pre-action systems in computer rooms and dry systems in refrigeration rooms | Installation of 6 conveyors, 5 escalators and 5 elevators in Terminal 4 | systems in Terminal 3: 1,500 controlled doors, 2,500 entry and exit points, 40 work stations, comprehensive fire detection and extinguishing systems, HMI system for control and management of boarding gates, central clock systems, CCTV, intercom and signaling.

Project in cooperation with: