Audi Ingolstadt, Germany | Audi Brussels, Belgium

West Europe

Installation of ventilation and air-conditioning systems. Further cooperation with Volkswagen following the construction of the new Volkswagen Crafter plant in Wozznia, Poland.
  • Location: Ingolstadt, Germany Brussels, Belgium
  • Client: Volkswagen
  • Period: 2017-2019
  • Description:

    In addition to the installation work, the work includes preparation of detailed engineering documentation for the contractor's work. In Brussels: preparation for renovations to the production hall L1/2 HRK. In Ingolstadt: installation of general ventilation systems and smoke removal channels in the new 3-story N60.3 production hall.

Project in cooperation with: