Block 5 and 6 Power Plant | Opola, Poland
Eastern Europe
- Client: Opola, Southern Poland
- Main Contractor: GE Power
- Period: 2017
- Description:
Installation of heating, ventilation and air conditioning (HVAC) systems including preparation of documentation, planning, supply, installation and certification. A complex project that requires two separate parameters to construct the boiler: the temperature under the roof and sub-pressure at ground level. All works are performed in accordance with strict ISO 9001 requirements and ISO 18001 regulations. The systems will be installed in electrostatic residue buildings |Design and installation of a comprehensive fire extinguishing system including two pipe pumps and sprinkler systems to protect all cable channels and power rooms in accordance with the German Standards Institute (VdS).