Shafdan (Sewage Treatment Plant of the Dan Region)

Israel

Three large pumping stations serving the center of the country.
  • Client: IguDan ‒ Dan Cities Association for Environmental Infrastructure
  • Budget: $33 million
  • Description:

    Installation of electro-mechanical systems for three pumping stations, including valves with a diameter of up to 60 inches,  steel pipes and GRP, high-voltage, low-voltage and very low-voltage systems, diesel generator and synchronized boards, supply and installation of dozens of water pumps with a capacity of up to 4,500 cubic meters| Supply of equipment and installation of mechanical and electrical systems, including low-voltage electrical boards, automation panels and 8-megawatt bio-gas cogeneration engines| Installation of the world's most advanced electrical and automation panels.

Project in cooperation with: