Shafdan (Sewage Treatment Plant of the Dan Region)
Israel
Three large pumping stations serving the center of the country.
- Client: IguDan ‒ Dan Cities Association for Environmental Infrastructure
- Budget: $33 million
- Description:
Installation of electro-mechanical systems for three pumping stations, including valves with a diameter of up to 60 inches, steel pipes and GRP, high-voltage, low-voltage and very low-voltage systems, diesel generator and synchronized boards, supply and installation of dozens of water pumps with a capacity of up to 4,500 cubic meters| Supply of equipment and installation of mechanical and electrical systems, including low-voltage electrical boards, automation panels and 8-megawatt bio-gas cogeneration engines| Installation of the world's most advanced electrical and automation panels.
Project in cooperation with: