Israel

Air conditioning for sterile manufacturing rooms and dry production rooms. Several projects including the “Copaxon” manufacturing plant.
  • Location: Kfar Saba
  • Client: Teva Pharmaceutical Industries Ltd
  • Period: 1995-2005
  • Budget: $ 6.7 million
  • Description:

    Air conditioning for sterile production and dry manufacturing in clean rooms.

Project in cooperation with: