Israel

The power station uses natural gas to supply up to 140 megawatts of electricity.
  • Client: Solel Boneh
  • Budget: $5 million
  • Description:

    Construction of a 161 kW substation, including supply and installation of cables, high voltage tower, switches and connectors, isolated lines, medium and low-voltage electrical panels, transformers and cables. Testing and certification.

Project in cooperation with: