Tel Aviv Courthouse | Tel Aviv

Israel

Financing, planning, construction, BOT management (21 years) of a 22-story tower, including parking, offices, courtrooms, conference rooms, detention cells, secure areas, a cafeteria building and dining hall, library, command room, and computer room. The eco-friendly building has been carefully designed for efficient use of water and power. It meets the highest standards for "green construction", thanks to double siding with ventilated interior space, controlled air conditioning, use of fresh air, LED lighting, and toilets that use water recycled from the air conditioning system
  • Location: Tel Aviv
  • Client: Israel Finance Ministry, Government Representative: Yair Artzi, CPM
  • Architect: Rechter Architects
  • Main Contractor: Electra M&E, Solel Boneh
  • Area:
    17,000m2 parking, 5,000m2 technical and storage rooms, 18,000m2 offices and halls, 3,000m2 detention cells
  • Description:

    A complex, challenging project, due to the relatively small operational space and the need to separate judges, detainees, and visitors. Installation of 4 chillers (capacity of 190 refrigeration tons), a 1250KVA generator, 3 transformers, manual and water pump rooms, all security and command systems, including access control, CCTV, audiovisual systems, intercoms, intruder alarms, communication networks, safes, and other anti-theft devices. All systems are controlled from a central command and control center equipped with an advanced video surveillance wall. Project included comprehensive management and maintenance  

Project in cooperation with: